Engine Install w/ Dave

Post Reply
Message
Author
Devious26
Posts: 0
Joined: Wed Mar 10, 2021 10:41 pm

#1 Post by Devious26 »

Installed an engine start to finish with Dave on Saturday. Went from rolling chassis to running/riding quad in about 6 hours. Thanks for the help and i'll be sure to take some pictures in Glamis.

Nate992v
Posts: 0
Joined: Wed Mar 10, 2021 10:41 pm

#2 Post by Nate992v »

QUOTE (Devious26 @ Oct 22 2014, 04:25 PM) <{POST_SNAPBACK}>
Installed an engine start to finish with Dave on Saturday. Went from rolling chassis to running/riding quad in about 6 hours. Thanks for the help and i'll be sure to take some pictures in Glamis.



Let us know when you're at Glamis. Maybe there are a couple more out here on the west coast. I'm usually camped down the Washes, by the railroad. Or at Gordon's Well.

Devious26
Posts: 0
Joined: Wed Mar 10, 2021 10:41 pm

#3 Post by Devious26 »

QUOTE (Nate992v @ Oct 23 2014, 08:36 PM) <{POST_SNAPBACK}>
Let us know when you're at Glamis. Maybe there are a couple more out here on the west coast. I'm usually camped down the Washes, by the railroad. Or at Gordon's Well.

Halloween I'll be in the washes, bringing my fresh built motor and happyboys 495 drag quad. Gonna be out all season as much as possible.

Post Reply